City of Hopkins

City of Hopkins

1010 First Street South

Hopkins MN 55343

952-939-1339 FAX 952-935-1834

www.hopkinsmn.com
www.hopkinsmn.com/inspections/building/garages/

ZONING ORDINANCES

Zoning Administration - 952.939.1360

DISTANCE FROM FRONT STREET PROPERTY LINE

a) Detached: 25′-35′ depending on zoning district
b) Attached: 25′-35′ depending on zoning district

DISTANCE FROM REAR PROPERTY LINE

a) Parallel to rear property line: 3′
b) Perpendicular and OHD faces alley: 20′
c) Perpendicular and OHD faces house: 3′
d) Attached to house: 25′-40′ depending on zoning
e) Percentage of rear yard allowed for garage: 6%-12% depending on zoning

DISTANCE FROM SIDE PROPERTY LINE

a) Detached and behind the house: 3′
b) Detached along side of house: 3′
c) Attached to house: 8′-25′ depending on zoning district

DISTANCE FROM SIDE STREET PROPERTY LINE

a) Detached and parallel to street: 12′
b) Detached and perpendicular to street: 20′
c) Attached and parallel to street: 12′
d) Attached and perpendicular to street: 18′

MINIMUM DISTANCE FROM OWNER’S DWELLING

a) Without frost footing: 6′
b) Without fire proofing: 6′

MINIMUM DISTANCE FROM NEIGHBOR’S DWELLING

a) Without frost footings: No restrictions
b) Without fire proofing: No restrictions

MINIMUM DISTANCE FROM UTILITY EASEMENT LINE

a) Existing detached garage: To easement
b) Existing attached garage: To easement

IS MORE THAN ONE GARAGE ALLOWED ON THE SAME LOT AS THE DWELLING

a) Existing detached garage: Yes - not to exceed 10% of lot.
b) Existing attached garage: Yes - not to exceed 10% of lot.

MAXIMUM SIZE GARAGE ALLOWED BY CITY

a) Detached: Zoning permits a % of lot size - 528 sf minimum & 1000 sf maximum
b) Attached: Zoning permits a % of lot size - 528 sf minimum & 1000 sf maximum

CAN A GARAGE BE BUILT ON A VACANT LOT

a) Adjoining lot: See inspector
b) Non adjoining lot: No

MISCELLANEOUS REMARKS

a) UBC requires removal of all decomposable material prior to placing slab.
b) Monolithic footings are accepted.
c) Lot size is required.
d) Height is limited to 15′ at midpoint between eave & peak.

APPLICATION FORMS & ADDENDUM

Permit Application:
a) When survey is on file:
b) When survey is not on file: Draw site plan to scale - indicate setbacks.
Survey or Scale Drawing: Submit 2 copies
Lot Size & Identification: Submit 2 copies
Elevation of Building: Submit 2 copies
Exposed corner irons: Exposed for building inspector.
Other: Submit 2 copies of floor plan indicating doors\windows.

REQUIRED PERMITS

Demolition Permit:
Driveway Permit:
Building Permit: Required
Miscellaneous Permits:

REQUIRED INSPECTIONS

Demolition Inspection:
Footing/Slab Inspection: Required - after form work, with rods & mesh in place, prior
to pouring.
Framing Inspection: Required - after siding/roofing are done. Go figure.
Submit truss specs at time of framing inspection.
Sheathing Inspection:
Electrical Inspection: Required
Final Building Inspection: After OHD installation, electrical final, garage completion

3/7/06 - Downloaded updates